A BIM model of the gypsum storage and sulfuric acid neutralization facilities of a metallurgical plant was developed By cp_admin | 05.04.2021 0 Comment A BIM model of the gypsum storage and sulfuric acid neutralization facilities of a metallurgical plant was developed The development of BIM model of gypsum storage facilities and sulfuric acid neutralization at a metallurgical plant.