UkraineOther countries

Lukoil Odessa Oil Refinery Plant JSC, Odessa

Environmental monitoring automated system of Lukoil Odessa Oil Refinery Plant JSC

Linik PJSC, Lisichansk

Design of the additives storage and dosing unit for the preparation of European standard diesel fuel – total storage volume of 5 additives, 100 tons each, daily preparation volume up to 10,000 tons of diesel fuel
Design of the circulation diagram of straight-run fuel oil of the CDU unit
Reconstruction of the ЛЧ-24-2000 unit # 2 in order to switch to the production of Euro-4 diesel fuel
Supply of hydrogen-containing gas from the pressure swing adsorption unit to the reforming unit ЛЧ 35-11/1000 #2
Connection of the treated wastewater post-treatment and desalination unit to the existing utilities and communications
Reconstruction of the steam condensate collection, treatment and return system to increase productivity
Modernization of the field instrumentation for hydrotreating unit ЛЧ-24-2000 #2
Reconstruction of unit ЛЧ 35-11/1000 for the selective hydrotreating process of catalytically cracked gasoline
Design of the hydrogen recovery unit by the PSA method. Performance of engineering services, field supervision, project of the unit connection to the plant process unit
Design for the collection of storm and waste water from the polypropylene workshop site. Performance of the general designer functions and design of the connection of the collection unit to the communications of the workshop
Development of a number of projects for the reconstruction of gallery racks for loading oil products (all racks of the plant, including liquefied gases)
Modernization of the ELIN single point loading unit
Modernization of the bitumen loading rack to ensure loading into containers
Hydrocarbon gases treatment from the plant’s units in the absorber K-205 of the hydrotreating diesel fuels unit in straight-run fraction 140 – 270°С ЛЧ-24-2000 # 2
Development of the feasibility study for the flare gases return to the technological process
Fulfillment of recommendations of the analysis of equipment functionality and potential risks (“HAZOP”) of the ЛЧ 35-11/1000 #2
Storage tank farm for high-temperature organic coolant for selective hydrotreating process of catalytically cracked gasoline and TAME recovery unit
Reconstruction of the diesel fuel tank farm piping diagram
Construction of the for shell-and-tube heat exchangers cleaning unit
Organization of the return diagram of waste propylene to raw materials
Mothballing and re-mothballing of the units of PJSC “Linik”
Revision of the technological regulations for the hydrogen recovery unit by the hydrocarbon gases conversion method

Zaporozhye Steel Rolling Plant OJSC, Zaporozhye

Design of the automated process control system for the alcohols and ketones shop (redundant system based on Mitsubishi controllers)

Severodonetsky AZOT ZAO, Severodonetsk

Design of the protective nitrogen hydrogen gas unit

Ryazan Oil Refining Company CJSC

Single point loading units # 1 and # 2 of area # 1 of shop # 11 of Ryazan Oil Refining Company CJSC
Technical re-equipment of the TK-1 unit of workshop No. 1 of CJSC RNPK in order to reduce the content of hydrogen sulfide in the visbreaking residue
Development of detailed design documentation for the project “Technical re-equipment of the extraction and secondary rectification unit of the Л-35/6-300 unit CJSC RNPK

PJSC MMC Norilsk Nickel, Norilsk

Development of design documentation for the reconstruction of elemental sulfur recovery unit at the Nadezhda Metallurgical Plant named after B.I. Kolesnikov of the Polar Division of PJSC MMC Norilsk Nickel (Together with Poener Ingenieurgesellschaft mbH, Austria)
Reconstruction of the elemental sulfur recovery unit at the Copper Plant of the Polar Division of PJSC MMC Norilsk Nickel (Together with Kazgiprotsvetmet LLP, Republic of Kazakhstan)
Development of detailed design documentation for the reconstruction of elemental sulfur recovery unit at the Nadezhda Metallurgical Plant named after B.I. Kolesnikov, Polar Division of PJSC MMC Norilsk Nickel (Together with SNC-Lavalin, Canada)
Neutralization of sulfuric acid and gypsum storage facilities at the Nadezhda Metallurgical Plant named after B.I. Kolesnikov of the Polar Division of PJSC MMC Norilsk Nickel

Gazpromneft-MNPZ JSC, Moscow

Reconstruction of the CDU / VDU-6 unit (Together with the company “EDL Anlagenbau”, Germany)
Rail rack for dark oil products loading and oil unloading
Oil heating unit
Rail rack for light oil products loading
Vapor recovery unit
Control room of rail oil products loading

NefteKhimService JSC, village of Yaya

Correction of the design documentation for the Yaya oil refinery of the first stage of construction (FS-Project) for facility No. 12 “Loading and unloading rail rack”

Volkhovneftekhim LLC, Volkhov

Rail rack for dark oil products loading and oil unloading
Rail rack for light oil products loading
Connection of vapor recovery unit АСУР-ПБ-120
Connection of vapor recovery unit АСУР-ПБ-500
Automated oil products loading station
Development of the plant security facilities
Development of design documentation for the production and dispatching complex of the plant
Development of electrical heating of pipelines for the AT-500 unit

Saratov Oil Refinery OJSC, Saratov

Reconstruction of the dark oil products loading rack (Together with the company “MARCON”, Germany)

TNK Lubricants LLC, Moscow

Technical re-equipment of the У-47/3 unit of workshop # 1

Irkutsk Oil Company LLC, Irkutsk

Connection of liquefied helium production plant at Yarakta oil and gas condensate field

Slavkali FLLC, Soligorsk

Design of potassium chloride mining and processing plant on the raw material base of the Starobin potash salt deposit in the Republic of Belarus

Amur Gas Chemical Complex, Amur region

Wastewater treatment facilities for rainwater effluents of the Amur Gas Chemical Complex